Civil engineer for house construction · Chennai

Your contractor builds it.Our engineer answers for it.

Rent an Engineer puts a qualified civil engineer on your site every working day — measuring quantities, testing materials, auditing every bill and sending the day's proof to your WhatsApp. You stay the owner, not the supervisor.

Book a free site visit
Chennai city & suburbs +91 98434 64543
A site engineer checking reinforcement against the drawing
Today on site · 6:58 PM Sent

Level 2 reinforcement checked against BBS. Cube test 7-day: 21.4 N/mm². 3 photos attached.

Mon – Sat

Engineer on site (full-time plan)

By 7 PM

The day's report on your WhatsApp

Stage-wise

Contractor paid only after checks pass

After handover

Defect inspections once you move in

Why an engineer of your own

Building without an engineer has a price too — it just never shows up on a bill.

Most owners are not construction people, and the trade knows it. A neutral engineer working for you, and paid by you, changes the arithmetic of the entire build.

Money

Quantity, rate and delivery — checked before you pay

Bills nobody can verify

Quantities rounded up. Rates a little above market. Material billed but never unloaded. No single line looks wrong on its own, and nobody on that site is being paid to check.

What changes

Every quantity re-measured on site and every bill checked against the agreed BOQ before it reaches you.

Time

Every day's progress logged, every delay flagged

A date that keeps moving

When nobody writes down what happened today, a week's slip quietly becomes a season's — and you carry rent and EMI together for months you never budgeted for.

What changes

Progress logged the same evening, so a slipped date reaches you inside one working day with the recovery plan attached.

Quality

Steel, cover and concrete — tested, not assumed

Faults you cannot see

A cube cast today is only tested at 7 and 28 days. Thin cover, under-grade steel and curing cut short never announce themselves at all — invisible on handover day, expensive the year the cracks arrive.

What changes

Cubes cast and lab-tested to schedule, steel grade and cover checked before every pour, each check photographed.

What is covered

Everything an owner cannot do from an office chair.

Not add-ons and not a premium tier. This is what a Rent an Engineer engagement includes from the day your file opens.

Plan & check

Before and during every pour

01

Drawings & quantities checked

Your approved plan and structural drawings read before work starts; gaps flagged in writing.

02

Line-item BOQ

Brand, grade, quantity and rate for every item — the yardstick every bill is checked against.

03

Checks before every pour

Steel, cover, shuttering and levels signed off on a pour card before concrete arrives.

04

Lab-tested materials

Concrete cubes, steel and waterproofing tested; results filed against their stage. Lab charges at actual cost.

Pay & track

Money and time, every day

05

Bills re-measured before you pay

Every contractor bill checked line by line against work measured on site, with the workings shown to you.

06

Stage sign-off before payment

A stage closes only after inspection and verified quantities — then you approve the contractor's payment.

07

Dated milestone plan

A stage-by-stage schedule agreed at the start; slippage flagged the day it begins.

08

Daily WhatsApp report

Photos, headcount, work done and issues — every evening, dated and searchable.

Materials & handover

Up to the keys, and after

09

Material grade & delivery check

Brand and grade checked on arrival; any substitution needs your written approval.

10

Every defect tracked

Each issue logged with a photo, a responsible person and a date, and closed back to you in writing.

11

Handover snag list

A full inspection before you take the keys, with every snag closed by the contractor.

12

Post-handover inspections

Scheduled inspections after you move in, for the period in your agreement; defects followed up with your contractor.

Included from the day your file opens — not a premium tier

Which of these apply to my build?
Where we start

Empty plot or half-built house — we can start either way.

You can call us before work starts, or after it has already begun. Most people call us after — and that is completely fine.

Starting from zero

Work not started yet

Starting from zero

You have a plot, a plan and a price from your contractor — but you don't know if that price is fair.

  • We check your drawings before you spend any money
  • We list every item and its cost, and compare it with your contractor's price
  • We tell you if the contractor's rates are higher than the market
  • Your engineer is on site from the day digging starts
Joining a running site

Work already started

Joining a running site

The work is half done, the bills don't add up, and you want someone to tell you what you have really paid for.

  • We inspect everything that is already built
  • We measure the work and check it against the bills you have already paid
  • We list the remaining work and what it should cost
  • From that day on we check every stage, and give you a written report of what we found

Most of our sites are already half-built when we join. Whichever one is yours, asking us costs nothing.

The difference

The same build, run two ways.

Read across each line. The left is what most owners live through; the right is what an engineer paid by you, and not by the contractor, changes.

Without an engineer

With Rent an Engineer

A lump sum per sq ft you cannot check

Quote

A line-item BOQ you read before you sign

Large advances paid ahead of work

Contractor advance

Paid only against stages that pass inspection

Paid as presented

Bills

Re-measured and checked line by line

Trust the contractor's word

Quality

Checked before every pour, lab-tested, photographed

Delays discovered months later

Schedule

Flagged the day they start, with a recovery plan

Grades change without notice

Materials

Any substitution needs your written approval

Leave from work to stand on site

Your time

The day's proof arrives on your phone

Everything on the “With” side

is what a Rent an Engineer engagement covers.

Ask what it costs for my build
How you will know

Everything reaches you in the chat you already use.

Your build reports into WhatsApp — dated, photographed and searchable for as long as you own the house. Nothing about your own building reaches you second-hand.

Today on site

Daily

A dated progress note with site photographs reaches you every evening — you know exactly what happened today.

Rupee tracker

Live

Every contractor bill set against the plan, with the audited figure and the deduction, if any, for you to approve by reply.

Stage sign-offs

Every stage

Each stage closes with its checklist, its defect list and a photographed sign-off — sent to you, not filed away.

Rent an Engineer

Your site engineer · online

Message your engineer…

Delivery log

Live

What arrived, what got consumed and what is left on site — recorded the day it lands, not at month end.

Headcount report

Daily

Trade-wise manpower on site each day — you see who worked, on what, and for how long.

Raise an issue

Tracked

Send a photo. It becomes a logged non-conformance with an owner and a date, and is closed back to you in writing.

How it runs

First call to handover, in six stages.

You see exactly what happens next at every stage — and you don't pay anything to find out whether we are worth it.

  1. Day 0

    Free site visit

    An engineer walks your plot, reads your drawings and tells you plainly what your build needs.

  2. Day 1–2

    KYC & proposal

    You fill a short KYC form; we send the plan, scope and fee in writing.

  3. On signing

    Your engineer is named

    Agreement signed; your engineer is introduced to you and your contractor.

  4. Week 1

    BOQ & milestone plan

    Quantities, budget and a dated schedule fixed with you; pre-construction checklist closed.

  5. Every day · Each stage

    Checks before money moves

    Daily report by 7 PM; each stage inspected and bills verified before you release payment.

  6. Handover

    Keys, papers & follow-up

    Snag list closed, documents handed over, then post-handover defect inspections.

Plans

Two ways to have an engineer on your side.

Exact fee confirmed after the free site visit, based on your building size and duration.

Full-time Site Engineer

Recommended

On quote/ month

Your engineer on site every working day, Mon – Sat, 9 AM – 7 PM, from excavation to handover.

  • All 12 checks in "What's covered"
  • Daily report on WhatsApp by 7 PM
  • Every contractor bill re-measured
  • Backup engineer on leave days

Stage-wise Inspection

On quote/ stage

For owners who are on site themselves. Your engineer inspects every critical stage before it is covered up.

  • Marking, excavation & footing
  • Every column and slab before the pour
  • Brickwork, plastering & waterproofing
  • Stage report with photos & handover snag list

BOQ preparation

One-time fee

Condition survey (running site)

One-time fee

Lab tests

At actual lab charges

Payment terms

Monthly in advance · or per stage

We don't hold the construction contract — and that is the point. Your contractor builds; our engineer represents you against that contractor. Because you pay us, there is nothing for us to gain from a bill going unchecked.